![]() |
|
||
In early spring of 2009, Jewett Roofing Company contracted with Chris Graue, of Graue Chevrolet, to completely tear off his existing roof and underlayment and replace it with a new roof. The job presented a few minor challenges, but in the end proved to be another outstanding project for Jewett Roofing.The project size was just under 25,000 square feet. The existing roof had been damaged by a late December storm, which caused minor damage to the southeast corner of the roof. This damage accelerated the time frame in which Mr. Graue was going to address the roof problems that he knew had already existed before the storm damage occurred.Immediately upon contacting Jewett Roofing we were on site and collecting all the necessary data. Through careful analysis and close consultation we were able to provide Mr. Graue with the information he needed to make an educated and well thought-out decision regarding who was going to do the work and what product would ultimately be installed. He had many different products and contractors to choose from, but in the end he chose Jewett Roofing and the white 50 mil Duro-Last single-ply membrane system. He also decided to replace all the guttering and downspouts with new 24-gauge Kynar metal gutters which are made by Duro-Last’s sister company, Exceptional Metals. This combination will provide a long-term solution to his facility’s roofing and waterproofing needs.Mr. Graue commented, “The service we received was great, from the time the sales rep, Chris Ceriotti, showed up to inspect the damage and make repair suggestions, to the service we received from Tony and his crew during the tear-off and installation and when the job was completed, everything was handled in a very professional manner. I would recommend the Duro-Last system and especially Jewett Roofing Company to any building owner. They are a professional company that employs people who genuinely care about the quality of the work they do and truly want to satisfy their customers.” He also showed his appreciation by cooking up a meal for the Jewett crew on two separate occasions.We here at Jewett Roofing truly do put our customers first. Our goal is to find the best long-term solution and cost effective method of roofing for our customer. We are committed to real solutions for roofing and waterproofing problems providing long-term security for our customers.![]() |
![]() Before work has begun
![]() After work is completed (ladder is in the same location as the “before” picture)
![]() Another section of the completed roof
![]() Detail of gutters and downspouts
|